CPS A-FRAME OVERHAUL & UPGRADE
Extending service life through refurbishment, structural upgrades and operational improvements
A-frames are critical handling systems used for deployment and recovery of subsea equipment, tools and survey systems. Operating in harsh offshore environments places significant demands on structural integrity, hydraulic performance and operational safety. Over time, wear, corrosion and evolving operational requirements create a need for refurbishment and technical upgrades to maintain safe and reliable operation.
This project involved a comprehensive overhaul and upgrade of an existing CPS A-Frame. The objective was to extend the operational lifetime of the equipment while implementing modifications that improved accessibility, safety and functionality for offshore personnel.
The project combined inspection, refurbishment, fabrication, hydraulic work, structural modifications and testing before the equipment was prepared for return to service.
Client
Confidential
Date
2026
Our Role
Turnkey Upgrade Contractor
Project duration
8 weeks
Scoope Of Work
The project included a complete refurbishment and upgrade programme focused on extending service life and improving operational functionality.
ENGINEERING & EXECUTION
STRUCTURAL REFURBISHMENT
HYDRAULIC SYSTEM UPGRADES
ACCESS & SAFETY IMPROVEMENTS
QUALITY, INSPECTION & DOCUMENTATION
TESTING & COMMISSIONING




