Extending the Operational Life of a Sepro HPL-15 A-Frame
Offshore handling systems are exposed to continuous mechanical loading, harsh weather conditions and corrosive marine environments. Over time, wear in hydraulic systems, drive components, structural interfaces and protective coatings can affect both reliability and operational efficiency.
For this project, Kverneland Aqua was contracted to perform a complete overhaul of a Sepro HPL-15 A-Frame. The objective was to restore functionality, address age-related degradation and prepare the equipment for continued offshore operations through inspection, refurbishment and targeted upgrades.
Client
Undisclosed
Date
2026
Our Role
Turnkey Upgrade Contractor
Schedule
6 weeks
Scoope Of Work
The overhaul programme included complete disassembly, cleaning and inspection of the A-Frame prior to refurbishment and reassembly. Major activities included:
Mechanical Overhaul
Complete dismantling, inspection and reassembly of the A-Frame, including replacement of worn fasteners and mechanical components where required.
Electrical & Control System Assessment
Assessment of existing electrical systems, control components and cable management arrangements to support reliable offshore operation.
Hydraulic Maintenance
Inspection of hydraulic circuits, hoses, fittings and actuators to identify wear, leakage risks and maintenance requirements.
Surface Treatment & Corrosion Repair
Preparation and refurbishment of structural steelwork followed by coating repair in accordance with offshore corrosion protection requirements.




