Engineering, fabrication, assembly, testing and project execution
The LARS (Launch and Recovery System) was developed and manufactured by Kverneland Aqua as a complete turnkey solution for the safe deployment and recovery of subsea sonar buoys in demanding offshore environments.
The project included the engineering, fabrication, machining, hydraulic integration, electrical installation, assembly, functional testing and documentation of a complete skid-mounted system. Designed specifically for Allton’s operational requirements, the system provides a compact, reliable and operator-friendly solution capable of efficient launch and recovery operations.
From concept through final testing, every stage of the project was completed in-house. Particular emphasis was placed on mechanical robustness, ease of maintenance, offshore reliability and compliance with customer specifications. The finished system demonstrates Kverneland Aqua’s capability to deliver complex engineered equipment combining mechanical, hydraulic and electrical disciplines into a single integrated solution.
Client
Allton AS
Date
2025
Our Role
Turnkey Upgrade Contractor
Project
LARS – Launch and Recovery System
Scoope Of Work
Kverneland Aqua was responsible for the complete delivery of the LARS package, including engineering, procurement, fabrication, machining, assembly, hydraulic and electrical integration, testing and commissioning preparation.
The system was developed to provide safe and efficient launch and recovery of sonar buoys while minimizing operator workload and maximizing operational reliability in offshore conditions.
Mechanical Engineering & Fabrication
Precision Machining & Assembly
Hydraulic & Electrical Integration
Drive System Modernisation
Functional Testing & Verification
Documentation & Offshore Readiness